Urban Wastewater Treatment Plant Model: A Harmonious Blend of Functionality and Greenery

Other Videos
February 21, 2024
Category Connection: Miniature Architectural Models
Explore our model featuring various equipment, showcasing the urban wastewater treatment plant transformed into a picturesque garden. Witness the seamless integration of industrial infrastructure with lush greenery, offering a unique perspective on the marriage of functionality and aesthetics in wastewater treatment.
Brief: Discover the Shenzhen Longgang Energy Eco-Park Showcase Model, a 1:200 scale tower model with a lifting machine, crafted by QZY Models for Shenzhen Energy Group. This sustainable urban design marvel showcases energy-efficient and eco-conscious living with interactive features and precision craftsmanship.
Related Product Features:
  • 1:200 scale tower model with a lifting machine, completed in 30 days.
  • Features coated acrylic for façades and roofs, ABS for floors and foundations, and 3D-printed SLA for interior equipment.
  • Precision laser-cutting technology for architectural elements and intricate details.
  • Interactive lifting roof controlled by an iPad to reveal internal workings.
  • Thoughtfully placed interior lighting and water features for enhanced realism.
  • Meticulously crafted to highlight sustainable innovation and eco-friendly design.
  • Dynamic fusion of cutting-edge materials and techniques for a realistic showcase.
  • Represents the future of sustainable urban living with visionary eco-conscious design.
Faqs:
  • What is the scale of the Shenzhen Longgang Energy Eco-Park Showcase Model?
    The model is built at a 1:200 scale, showcasing detailed and precise representations of the eco-park.
  • What materials are used in the construction of the tower model?
    The model uses coated acrylic for façades and roofs, ABS for floors and foundations, and 3D-printed SLA for interior equipment and furniture.
  • How long did it take to complete the Shenzhen Longgang Energy Eco-Park Showcase Model?
    The model was completed in 30 days, featuring meticulous craftsmanship and sustainable design elements.
  • What interactive features does the model include?
    The model features a lifting roof controlled by an iPad, allowing users to explore the internal workings and processes of the eco-park.