View HSA- 1/300 Shenzhen Public Security Bureau Baoan Branch 110 Command Center Scheme model Demo

Other Videos
December 21, 2025
Category Connection: Architectural Concept Model
Brief: This short presentation tells the story behind the design and its intended use cases. Join us for a detailed walkthrough of the HSA-1/300 Shenzhen Public Security Bureau Baoan Branch 110 Command Center Scheme model. You'll see how this architectural model, crafted at a 1:300 scale, captures the essence of civic protection with precision, from its reflective glass curtain walls to the authentic miniature landscapes and symbolic details.
Related Product Features:
  • Meticulously crafted at a precise 1:300 scale, capturing the architectural essence of the command center.
  • Features electroplated semi-reflective gray-blue acrylic glass curtain walls for a sophisticated appearance.
  • Exterior walls utilize advanced faux stone crafting techniques to simulate stone-like solidity.
  • Includes detailed miniature elements such as police vehicles, formations, and national/police emblems.
  • Landscaping incorporates real green plants to authentically recreate the surrounding environment.
  • Completed efficiently within a seven-day timeframe without compromising on intricacy or accuracy.
  • Represents a successful collaboration between QZY Models and HSA Architects, symbolizing civic pride.
  • Serves as a tangible connection to the real-world public security infrastructure and its design.
FAQs:
  • What is the scale of the Shenzhen Public Security Bureau Baoan Branch 110 Command Center model?
    The model is meticulously crafted at a 1:300 scale, ensuring precise representation of the architectural details and overall structure.
  • What materials are used for the exterior of the model?
    The model features electroplated semi-reflective gray-blue acrylic for the glass curtain walls and advanced faux stone crafting techniques for the remaining exterior walls, providing a sophisticated and solid appearance.
  • How long did it take to complete this architectural model?
    The entire project, from conceptualization to completion, was efficiently completed in just seven days, showcasing a time-efficient approach without sacrificing detail or accuracy.
  • Does the model include landscaping details?
    Yes, the model authentically recreates the surroundings with real green plants, meticulously planned trees, and grassy areas, offering a tangible connection to the real-world environment.